Tongariro River Motel
  • Home
  • Booking
  • Location
  • Contact
  • Links
  • Daily Report
April 20, 2026

Work on Tongariro River swingbridge started.

Access to the Major Jones Pool, the most popular fishing pool on the river, may be difficult for anglers, bikers and walkers. The existing bridge has been blocked off from 20 April at the eastern end for construction of the replacement bridge. The Major Jones Pool could still be accessed from the Northern SH 1 end, but that would require walking past Judges’ Pool, which may be too much to ask. The popular 3 km circuit at the northern end of the Tongariro Trail may be blocked off until construction is finished.

Someone’s dog did not read the instructions…

The larger new bridge will be 70 m long with a deck width of 1.25m.

Watch this space for updates.

Previous StoryState of local emergency declared in Ruapehu District, residents prepare to evacuate
Next StorySmall towns must be part of NZ’s tourism narrative
August 2026
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Jul    
  • Home
  • Booking
  • Location
  • Contact
  • Links
  • Daily Report

Site and hosting by iConcept | Copyright © Tongariro River Motel